SpaceX
Contract Activity
About this chart
- Award action date — The government’s official date for a new award, funding change, or deobligation. This is the date shown on the chart’s timeline.
- Work start — The date performance under the award begins. It may fall before or after the award action date.
- Hit the public record — The date the action first appeared in public data. This can be months after the government’s official action date.
- Department of War coverage boundary — Normal-volume Department of War reporting is established through Jul 17. Dates after that point are shaded because coverage is incomplete, even though some Department records may already appear there.
Bars in the shaded period are actions already present in public data. The running total may change as delayed Department records arrive, so the current shape does not establish a change in contract activity.
118 source corrections recorded for this company.
Expand
Explore reported activity
Move across a bar or line point to inspect a date.
New Obligations
Deobligations
Running Net Total
Comparison
Company Contract Activity Ledger
Reported federal transactions from SpaceX's prime contracting perspective| Awarding agency | Action Date | Action Type | Obligated Amount | Contract Scope & Description | Receipt |
|---|---|---|---|---|---|
| NASA | Oct 6 | Funding modification | +$19.4K | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | USAspending ↗ |
| NASA | Sep 30 | Funding modification | +$9.15M | THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO PROVIDE ATP FOR DSL-2. | USAspending ↗ |
| State | Sep 30 | New award | +$4.96M | PERU - SPACE X STARLINK | USAspending ↗ |
| NASA | Sep 28 | Funding modification | +$23.56M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Homeland Security | Sep 24 | New award | +$1.50M | STARSHIELD SERVICE TOKENS | USAspending ↗ |
| State | Sep 24 | Deobligation | -$77.3K | STARLINK SERVICE | USAspending ↗ |
| State | Sep 24 | New award | +$77.3K | STARLINK SERVICE | USAspending ↗ |
| NASA | Sep 23 | Funding modification | +$7.00M | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | USAspending ↗ |
| State | Sep 23 | New award | +$77.3K | STARLINK SERVICE | USAspending ↗ |
| State | Sep 23 | Funding modification | +$30.2K | STARLINK SERVICE (NEC SDA FLOOR1) GLOBAL PRIORITY | USAspending ↗ |
| State | Sep 23 | Funding modification | +$30.0K | STARLINK SERVICE 08/26-10/26 | USAspending ↗ |
| State | Sep 23 | Funding modification | +$30.0K | STARLINK SERVICE TBASHY1 RESIDENTIAL GLOBAL PRIORITY 08/26-10/26 | USAspending ↗ |
| State | Sep 23 | Funding modification | +$27.4K | STARLINK SERVICE (NEC SDA FLOOR4) GLOBAL PRIORITY | USAspending ↗ |
| State | Sep 21 | New award | +$64.5K | INTERNET SERVICE | USAspending ↗ |
| NASA | Sep 18 | Funding modification | +$519.39M | THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). | USAspending ↗ |
| NASA | Sep 16 | Funding modification | +$1.00M | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | USAspending ↗ |
| State | Sep 16 | Funding modification | +$20.6K | STARLINK SERVICE - GLOBAL PRIORITY | USAspending ↗ |
| NASA | Sep 16 | Deobligation | -$1 | THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO DEOBLIGATE FUNDING IN THE AMOUNT OF $1. | USAspending ↗ |
| State | Sep 9 | New award | +$15.4K | STARLINK SERVICE - GLOBAL PRIORITY | USAspending ↗ |
| NASA | Aug 21 | Funding modification | +$150.00M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| State | Aug 14 | New award | +$15.4K | STARLINK SERVICE 08/26-10/26 | USAspending ↗ |
| State | Aug 14 | New award | +$15.4K | STARLINK SERVICE TBASHY1 RESIDENTIAL GLOBAL PRIORITY 08/26-10/26 | USAspending ↗ |
| State | Aug 14 | New award | +$15.4K | STARLINK SERVICE (NEC SDA FLOOR1) GLOBAL PRIORITY | USAspending ↗ |
| State | Aug 14 | New award | +$15.4K | STARLINK SERVICE (NEC SDA FLOOR4) GLOBAL PRIORITY | USAspending ↗ |
| Justice | Aug 11 | New award | +$600.0K | SPACEX SATELLITE COMMUNICATIONS | USAspending ↗ |
| Department of War | Jul 16 | Funding modification | +$29.36M | PROLIFERATED LOW EARTH ORBIT BEST EFFORT 05 PROGRAM | USAspending ↗ |
| Department of War | Jul 16 | New award | +$310.5K | SPRINGER HBTSS DE-ORBIT TEST EVENT | USAspending ↗ |
| NASA | Jul 14 | Funding modification | +$7.88M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Jul 14 | Funding modification | +$370.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Jul 13 | Funding modification | +$1.56M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| NASA | Jul 1 | Funding modification | +$3.78M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Jun 29 | New award | +$19.40M | PHASE 3 LANE 2 AWARD FEE | USAspending ↗ |
| Department of War | Jun 29 | Funding modification | +$12.54M | PROLIFERATED LOW EARTH ORBIT BEST EFFORT 05 PROGRAM | USAspending ↗ |
| Department of War | Jun 26 | Funding modification | +$3.17M | PROLIFERATED LOW EARTH ORBIT BEST EFFORT 05 PROGRAM | USAspending ↗ |
| Homeland Security | Jun 26 | Funding modification | +$8.6K | STARLINK INTERNET SERVICES FOR US COAST GUARD AIR STATION SITKA | USAspending ↗ |
| Department of War | Jun 25 | New award | +$56.1K | STARSHIELD - LOW EARTH ORBIT COMSATCOM ( | USAspending ↗ |
| Department of War | Jun 24 | Funding modification | +$26.14M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Jun 24 | New award | +$685.6K | WHITE HOUSE COMMUNICATIONS AGENCY (WHCA) STARLINK GSA ORDER - CSS0144 | USAspending ↗ |
| Department of War | Jun 18 | Funding modification | +$250.0K | PROLIFERATED LOW EARTH ORBIT BEST EFFORT 05 PROGRAM | USAspending ↗ |
| Department of War | Jun 17 | New award | +$23.11M | PROLIFERATED LOW EARTH ORBIT BEST EFFORT 05 PROGRAM | USAspending ↗ |
| Department of War | Jun 15 | Funding modification | +$537.8K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Jun 10 | Funding modification | +$2.43M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| NASA | Jun 5 | Funding modification | +$100.8K | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | USAspending ↗ |
| Department of War | Jun 2 | New award | +$84.27M | NATIONAL SECURITY SPACE LAUNCH PHASE 3 LANE 2 PROCUREMENT | USAspending ↗ |
| Department of War | Jun 2 | New award | +$37.4K | STARLINK GENERATION 3 TERMINALS | USAspending ↗ |
| NASA | Jun 1 | Funding modification | +$12.44M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Transportation | May 29 | Funding modification | +$9.0K | EXERCISES OPTION ITEM, EXTENDS THE TERM OF THE CONTRACT, AND INCREASES TOTAL OBLIGATION | USAspending ↗ |
| NASA | May 26 | Funding modification | +$47.6K | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. | USAspending ↗ |
| Department of War | May 22 | New award | +$131.79M | PLEO WARRIOR PLAN SUPPORT: SECURE GLOBAL SATCOM VIA POOLED STARSHIELD SERVICE. ENHANCED FEATURES, SECURITY, AND CENTRAL MANAGEMENT FOR ALL MISSIONS. | USAspending ↗ |
| NASA | May 21 | Funding modification | +$13.37M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | May 15 | Funding modification | +$10.60M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | May 15 | Funding modification | +$1.18M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | May 14 | Funding modification | +$20.00M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | May 8 | Funding modification | +$3.13M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | May 4 | New award | +$170.27M | NATIONAL SECURITY SPACE LAUNCH (NSSL) PHASE 3 LANE 2 LAUNCH SERVICES PROCUREMENT | USAspending ↗ |
| Department of War | May 4 | Funding modification | +$88.95M | LAUNCH SERVICE FOR NROL-86 | USAspending ↗ |
| Department of War | Apr 30 | Funding modification | +$1.82M | NATIONAL SECURITY SPACE LAUNCH (NSSL) PHASE 2 | USAspending ↗ |
| Department of War | Apr 30 | Deobligation | -$345.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 LAUNCH SERVICES | USAspending ↗ |
| Department of War | Apr 29 | Funding modification | +$915.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 29 | Funding modification | +$350.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Apr 27 | Funding modification | +$269.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 27 | Funding modification | +$160.9K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 24 | Funding modification | +$5.08M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 23 | Funding modification | +$77.62M | THE PURPOSE OF THIS EFFORT IS TO EXECUTE THE PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-2. | USAspending ↗ |
| Interior | Apr 22 | Funding modification | +$219.07 | FY25 CRD INTERNET (NVSO) MODIFICATION TO ADD FUNDING AND CHANGE CO | USAspending ↗ |
| Department of War | Apr 17 | Funding modification | +$7.00M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 17 | Funding modification | +$1.62M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Apr 16 | Funding modification | +$366.0K | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-2 | USAspending ↗ |
| Department of War | Apr 14 | New award | +$57.30M | LINK-182 DESIGN AND DEMONSTRATION | USAspending ↗ |
| Department of War | Apr 14 | Funding modification | +$7.99M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 14 | New award | +$130.6K | THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE STARLINK LOCAL PRIORITY SERVICE FOR THE WHITE HOUSE COMMUNICATIONS AGENCY (WHCA). | USAspending ↗ |
| Department of War | Apr 10 | Funding modification | +$153.84M | THE PURPOSE OF THIS EFFORT IS TO EXECUTE THE PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-1. | USAspending ↗ |
| Department of War | Apr 9 | Funding modification | +$81.65M | SEE ATTACHMENT 1, PERFORMANCE WORK STATEMENT (PWS) | USAspending ↗ |
| Department of War | Apr 9 | Funding modification | +$16.50M | SEE ATTACHMENT 1, PERFORMANCE WORK STATEMENT (PWS) | USAspending ↗ |
| NASA | Apr 9 | Funding modification | +$1.63M | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Apr 8 | Funding modification | +$30.00M | CSMI PAYMENT #2 | USAspending ↗ |
| Department of War | Apr 8 | Deobligation | -$1.88M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Apr 8 | New award | +$1.32M | NSSL PHASE 3 LANE 2 EXECUTION | USAspending ↗ |
| Department of War | Apr 8 | Funding modification | +$460.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Apr 7 | New award | +$120.0K | WALKMAN RADIOS TO SUPPORT MISSION CRITICAL PROJECTS. | USAspending ↗ |
| Department of War | Apr 7 | Funding modification | +$100.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Apr 6 | Funding modification | +$103.56M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-5 | USAspending ↗ |
| Department of War | Apr 2 | Funding modification | +$6.86M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Apr 1 | New award | +$142.19M | FA8811-25-D-B002 NSSL PHASE 3 LANE 2 LAUNCH SERVICES FOR USSF-206 | USAspending ↗ |
| Department of War | Apr 1 | Deobligation | -$71.43M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Homeland Security | Apr 1 | Funding modification | +$3.0K | STARLINK COMMERCIAL INTERNET AT USCG SECTOR WESTERN ALASKA | USAspending ↗ |
| Department of War | Mar 31 | New award | +$84.84M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-4 | USAspending ↗ |
| NASA | Mar 31 | Deobligation | -$35.50M | GATEWAY LOGISTICS SERVICES (GLS) CONTRACT AWARD - SPACE EXPLORATION TECHNOLOGIES (SPACEX). | USAspending ↗ |
| Department of War | Mar 31 | Funding modification | +$960.0K | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Mar 30 | Funding modification | +$16.72M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-5 | USAspending ↗ |
| Department of War | Mar 27 | Funding modification | +$2.16M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 27 | Funding modification | +$25.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Mar 27 | Deobligation | -$10.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 25 | Funding modification | +$8.37M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 25 | Funding modification | +$3.01M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 23 | Deobligation | -$275.4K | THIS MODIFICATION IMPLEMENTS THE LATEST PERFORMANCE WORK STATEMENT (PWS) AND PARTIAL PAYMENT DELIVERY SCHEDULE (PDP) REVISIONS, DECREASING OVERALL COST OF THE CONTRACT. | USAspending ↗ |
| Department of War | Mar 23 | New award | +$130.6K | THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE STARLINK LOCAL PRIORITY SERVICE FOR THE WHITE HOUSE COMMUNICATIONS AGENCY (WHCA). | USAspending ↗ |
| Department of War | Mar 23 | New award | +$4.0K | MONTHLY SERVICE FOR STARLINK EQUIPMENT | USAspending ↗ |
| Department of War | Mar 18 | Funding modification | +$150.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 17 | Funding modification | +$2.32M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 17 | Funding modification | +$480.0K | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| NASA | Mar 13 | Funding modification | +$588.7K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Mar 12 | Funding modification | +$1.65M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Mar 10 | Funding modification | +$103.5K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Mar 4 | Funding modification | +$2.02M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSX NAVAIR PLEO NEEDS. | USAspending ↗ |
| NASA | Mar 4 | New award | +$344.8K | THE COMMERCIALIZATION, INNOVATION, AND SYNERGIES (CIS) OFFICE'S FOURTH CAPABILITY STUDIES BAA IS SEEKING INDUSTRY INSIGHTS IN THE FOLLOWING: MARS END-TO-END COMMUNICATION SERVICE ARCHITECTURES | USAspending ↗ |
| Veterans Affairs | Mar 4 | Deobligation | -$25 | LOW EARTH ORBITING SATELLITE INTERNET SERVICES | USAspending ↗ |
| Department of War | Mar 3 | Funding modification | +$4.06M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Mar 3 | Funding modification | +$500.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Mar 2 | Funding modification | +$240.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Feb 27 | Funding modification | +$1.24M | SDA TRACKING LAYER TRANCHE 0 (T0) TRACKING | USAspending ↗ |
| Department of War | Feb 27 | Funding modification | +$300.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Feb 26 | Funding modification | +$6.75M | NATIONAL SECURITY SPACE LAUNCH SERVICES PHASE 3, LANE 2 | USAspending ↗ |
| Department of War | Feb 26 | Funding modification | +$5.70M | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Feb 26 | Funding modification | +$2.43M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Feb 26 | Funding modification | +$305.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Feb 26 | Funding modification | +$84.5K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Feb 24 | Funding modification | +$42.17M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-5 | USAspending ↗ |
| Department of War | Feb 24 | Funding modification | +$12.19M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Feb 11 | Funding modification | +$3.72M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Feb 9 | Funding modification | +$525.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Feb 9 | Funding modification | +$290.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| NASA | Feb 9 | Funding modification | +$150.9K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Feb 6 | New award | +$1.6K | SATELLITE SERVICE FOR 2 STARLINK KITS | USAspending ↗ |
| NASA | Feb 4 | Funding modification | +$677.0K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Jan 30 | Funding modification | +$1.23M | OPERATIONAL, PACKAGED, PLEO BROADBAND DATA TRANSPORT SERVICES WITH GLOBAL COVERAGE AND INTERNET CONNECTIVITY FOR FIXED, PORTABLE, LAND MOBILE, AND MARITIME USERS, AND ANY ANCILLARY SERVICES NEEDED TO COMPLETE THE REQUIREMENTS. | USAspending ↗ |
| Department of War | Jan 28 | Funding modification | +$250.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Jan 23 | Funding modification | +$14.35M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| State | Jan 21 | New award | +$3.07M | STARLINK MINI KITS | USAspending ↗ |
| Department of War | Jan 20 | Funding modification | +$13.96M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Jan 20 | Deobligation | -$13.96M | NATIONAL SECURITY SPACE LAUNCH PHASE 3 LANE 2 | USAspending ↗ |
| Department of War | Jan 16 | Funding modification | +$10.83M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Jan 14 | Funding modification | +$305.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2, LAUNCH SCHEDULE ADJUSTMENT AND TO ADD POSTPONEMENT FEES. | USAspending ↗ |
| NASA | Jan 14 | Funding modification | +$173.3K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Jan 13 | New award | +$166.97M | NATIONAL SECURITY SPACE LAUNCH SERVICES PHASE 3, LANE 2 | USAspending ↗ |
| Department of War | Jan 13 | Funding modification | +$79.17M | THE PURPOSE OF THIS EFFORT IS TO EXECUTE THE PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-1. | USAspending ↗ |
| Department of War | Jan 13 | Funding modification | +$3.15M | SEE ATTACHMENT 1, PERFORMANCE WORK STATEMENT (PWS) | USAspending ↗ |
| Department of War | Jan 12 | New award | +$65.00M | LAUNCH SERVICE FOR NROL-86 | USAspending ↗ |
| Department of War | Jan 9 | New award | +$42.17M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-5 | USAspending ↗ |
| Department of War | Jan 8 | Funding modification | +$1.25M | SEE ATTACHMENT 1 - PERFORMANCE WORK STATEMENT | USAspending ↗ |
| Department of War | Jan 7 | Funding modification | +$180.0K | NATIONAL SECURITY SPACE LAUNCH PHASE 2 SPACEX EXECUTION | USAspending ↗ |
| Department of War | Dec 31 | Funding modification | +$300.0K | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| Department of War | Dec 31 | Funding modification | +$114.8K | ROCKET CARGO CAPABILITY TESTING | USAspending ↗ |
| Department of War | Dec 23 | Funding modification | +$27.24M | THIS REQUIREMENT FULFILLS THE SSC/CMSC BE05 PROGRAM. | USAspending ↗ |
| NASA | Dec 22 | New award | +$264.5K | STARSHIELD TERMINALS WITH GLOBAL ACCESS SUBSCRIPTIONS | USAspending ↗ |
| NASA | Dec 19 | Funding modification | +$28.5K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Dec 19 | New award | +$500 | SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | USAspending ↗ |
| Department of War | Dec 18 | Deobligation | -$54.14M | NATIONAL SECURITY SPACE LAUNCH PHASE 3 LANE 2 | USAspending ↗ |
| Department of War | Dec 18 | Funding modification | +$6.60M | SATELLITE PROCESSING FACILITY THAT CAN ACCOMMODATE UP TO 21 SATELLITES AND DISPENSER STACK, POST TRANSPORT FUNCTIONAL TESTING AS REQUIRED, AND MECHANICAL AND ELECTRICAL MATES TO THE DISPENSER HARDWARE. | USAspending ↗ |
| Department of War | Dec 18 | Funding modification | +$4.58M | SEE ATTACHMENT 1, PERFORMANCE WORK STATEMENT (PWS) | USAspending ↗ |
| Department of War | Dec 18 | New award | +$2.40M | THIS REQUIREMENT IS TO FULFILL THE SSC/CMSC NAVAIR PLEO NEEDS. | USAspending ↗ |
| Department of War | Dec 18 | Funding modification | +$350.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Dec 15 | Funding modification | +$1.92M | NATIONAL SECURITY SPACE LAUNCH PHASE 2. | USAspending ↗ |
| Department of War | Dec 12 | New award | +$5.95M | COMMERCIAL SATELLITE COMMUNICATIONS SERVICE AND HARDWARE. | USAspending ↗ |
| Department of War | Dec 8 | New award | +$159.97M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-2 | USAspending ↗ |
| Department of War | Dec 8 | New award | +$77.10M | PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-3 | USAspending ↗ |
| Department of War | Dec 3 | Funding modification | +$425.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Dec 3 | Deobligation | -$164.0K | ROCKET CARGO CAPABILITY TESTING | USAspending ↗ |
| Department of War | Nov 26 | Deobligation | -$950.0K | MP448 BEST EFFORT SUBSCRIPTION | USAspending ↗ |
| Department of War | Nov 25 | Funding modification | +$1.55M | OPERATIONAL, PACKAGED, PLEO BROADBAND DATA TRANSPORT SERVICES WITH GLOBAL COVERAGE AND INTERNET CONNECTIVITY FOR FIXED, PORTABLE, LAND MOBILE, AND MARITIME USERS, AND ANY ANCILLARY SERVICES NEEDED TO COMPLETE THE REQUIREMENTS. | USAspending ↗ |
| Department of War | Nov 25 | Funding modification | +$450.0K | AERO USER TERMINAL - TILE ANTENNA | USAspending ↗ |
| Department of War | Nov 21 | Funding modification | +$155.0K | NATIONAL SECURITY SPACE LAUNCH SERVICES | USAspending ↗ |
| Department of War | Nov 18 | Funding modification | +$56.8K | OPERATIONAL, PACKAGED, PLEO BROADBAND DATA TRANSPORT SERVICES WITH GLOBAL COVERAGE AND INTERNET CONNECTIVITY FOR FIXED, PORTABLE, LAND MOBILE, AND MARITIME USERS, AND ANY ANCILLARY SERVICES NEEDED TO COMPLETE THE REQUIREMENTS. | USAspending ↗ |
| Department of War | Nov 14 | New award | +$135.00M | SBS005513- STARSHIELD SERVICE SUPPORT | USAspending ↗ |
| Department of War | Nov 7 | Funding modification | +$18.80M | NATIONAL SECURITY SPACE LAUNCH PHASE 2 | USAspending ↗ |
| Department of War | Nov 6 | Funding modification | +$120.0K | OPERATIONAL, PACKAGED, PLEO BROADBAND DATA TRANSPORT SERVICES WITH GLOBAL COVERAGE AND INTERNET CONNECTIVITY FOR FIXED, PORTABLE, LAND MOBILE, AND MARITIME USERS, AND ANY ANCILLARY SERVICES NEEDED TO COMPLETE THE REQUIREMENTS. | USAspending ↗ |
| NASA | Nov 6 | Funding modification | +$96.5K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| NASA | Nov 5 | Deobligation | -$250.0K | VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | USAspending ↗ |
| NASA | Oct 31 | Funding modification | +$106.9K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |
| Department of War | Oct 30 | Funding modification | +$740.0K | OPERATIONAL, PACKAGED, PLEO BROADBAND DATA TRANSPORT SERVICES WITH GLOBAL COVERAGE AND INTERNET CONNECTIVITY FOR FIXED, PORTABLE, LAND MOBILE, AND MARITIME USERS, AND ANY ANCILLARY SERVICES NEEDED TO COMPLETE THE REQUIREMENTS. | USAspending ↗ |
| NASA | Oct 27 | Funding modification | +$427.1K | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | USAspending ↗ |